Monday, September 10, 2012
Picking off little things.
So for the last few months I couldn't find the special shouldered bolts that attach the center axle bearing housing to the engine, that thing has just been hanging out until now. I found the bolts while looking for other things, so that is now attached for good.
Also I deemed it time to install the radiator for good, that thing looks nice! I had pulled it out to protect it until now.
I also secured some of the brake lines to the car a little better, and cut/installed the heater hoses. There also is this little breather box on the back of the engine that needed a new O-ring, I put that back together too.
I'm installing the shift linkage, that thing was perfect but for some reason, it is hitting things. I'll have to beat on it a bit. Another thing I did was to order some bolts that will be used as wheel studs through my brake disk, drive flange and wheel spacer stack up. Then on go the wheels!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Fell free to post any questions and I'll do my best to help you out with your project.